My original point is not really the rate as such, but the fact that you (not you really)wouldn't do a load for .50 per mile but you do one for .80 and then relocate over 600 mile to wait for your next load. 600 mile is the same loaded or not.
The point is, by doing all that relocation you're cutting your rate significantly. You would be better off running cheap.i don't run cheap and I don't chase freight.