Last night I took 2 racks of stamped panels and 2 tubs of stamped brackets to a company to make oven doors with. I went around to the docks the guard told me to go to. When I got there I was told it would be a few minutes till they could unload me, even though it was hot freight and I was an hour late after a 2.25 hour detention at the shipper. They were picking stuff up. Someone had put about a 44x44 tub on a stack of 48x48 tubs and others had put more 48x48 on top of that. When gravity finally won the several tubs crashing down took down a few more tubs as well as several of the racks of large sheets. They had a lot already picked up when I got there judging from the empties pushed off randomly to the side. They still had a lot left to pick up after I was unloaded and leaving.
Leo Bricker, 73's K5LDB
OOIDA Life Member 677319, JOIN NOW
Owner, Panther trucks 5508, 5509, 5641
EO Forum Moderator
----------
Support the entire Constitution, not just the parts you like.
Leo Bricker, 73's K5LDB
OOIDA Life Member 677319, JOIN NOW
Owner, Panther trucks 5508, 5509, 5641
EO Forum Moderator
----------
Support the entire Constitution, not just the parts you like.