ChanceMaster
Expert Expediter
Last night I put our refer on cycle mode enroute on a load. I have never done this before, but was bored/curious and remembered the clink canned message about running on continuous for pharmaceuticals. Our load is not pharmaceutical. An hour after switching to cycle mode, I get a c link message asking me to switch back to continuous mode, and that FYI, All Temp control loads are to be run on continuous cycle.
Any truth to this ? First hand knowledge ?
Sent from my PC36100 using EO Forums
Any truth to this ? First hand knowledge ?
Sent from my PC36100 using EO Forums